Capacity increased in March
Capacity increased in March with the arrival of the third high cavity all electric machine. Increased capacity in March with the arrival of new all electric machine at our site in Wigston Leicestershire.
Capacity increased in March with the arrival of the third high cavity all electric machine. Increased capacity in March with the arrival of new all electric machine at our site in Wigston Leicestershire.
New 3Ltr Jerrycan with 38mm CRC and T/E neck variants available.